Percolation Ground Testing
What is a percolation test?
A percolation test measures how quickly water drains through the soil, helping to determine whether the ground is suitable for a wastewater drainage field or percolation area. The test involves filling a specially prepared hole with water and measuring the rate at which it is absorbed into the surrounding subsoil.
The results provide essential information about the ground’s drainage characteristics, allowing an appropriately sized and designed wastewater drainage system to be planned. Percolation testing is an important part of the site assessment process and may be required when applying for Consent to Discharge approval, depending on the proposed system and discharge method.
With over 25 years of experience, Dynamic Tank Solutions provides professional percolation testing and site assessments for domestic and commercial properties. Our experienced team can guide you through the testing, planning and consent application process, helping to ensure your wastewater drainage system is designed to meet the specific requirements of your property and relevant environmental regulations.
Contact Dynamic Tank Solutions today to discuss your percolation testing requirements and find out how we can assist with your wastewater drainage project.
The Process
Day 1 – Initial Percolation Test
On the first day, we allow a six-hour window to carry out the initial percolation test. If the test exceeds six hours, the ground may be unsuitable for a standard drainage field, and a bespoke design solution may be required. Tests completed within six hours will be assessed against the relevant percolation criteria to determine suitability. The calculated percolation value (Vp) is also considered when assessing the ground’s drainage characteristics.
Additional Testing – Days 2 and 3
If the initial test exceeds 3.5 hours, a second site visit may be required. Where testing exceeds 4.5 hours, a third visit may also be necessary. These additional visits allow us to complete the required testing and gather sufficient information for the proposed drainage system design.
Test Results and Consent Applications
Where required, the completed percolation test results are submitted as supporting information with the Consent to Discharge application to the Northern Ireland Environment Agency (NIEA). DTS will explain the testing requirements and provide guidance throughout the application process.
Testing Costs and Additional Visits
Our initial quotation covers one day of percolation testing. Should additional testing days be necessary, these will incur further charges, as agreed with the customer before work begins. The number of visits required cannot always be determined in advance, although our experience of local ground conditions allows us to provide an indication of what may be expected.